This weekend I got a lot of things done that have been on my list. First I installed a charging port in the old gas cap location. Here it is, and the odd shape is for the special plug already connected to the charger.
I also configured the K&W BC-20 for 96 volts and tried it out. So far so good, but I need to make a water proof box because this charger is setup to be on off board charger. It was setup this way when I bought it, and I decided to keep it that way.
I also installed the PakTrakr into the dash. It previous sat on the passenger's seat, and it was always in the way when I took someone for a ride, or picked up someone.
I redid my battery pack wiring with the new 2/0 gauge cables I got with the lot I purchased that included the charger, motor, meters, etc. I cleaned up the connections and they fit perfectly. The battery pack is much cleaner now and is presentable.
The last thing I did was work on the FB1-4001A. I had to adjust the timing from CCW to CW. I also greased up the bearings and the next thing I need to do is check the brushes and use the brush stone to reseat them.
I haven't driven the EV this past weekend because of all the work I was doing on it. I probably won't be able to work on it until Friday or this weekend, but I intend to contact the machine shop about getting the new plates made for this motor.
No comments:
Post a Comment